YAVUZ SULTAN SELIM BRIDGE STEEL CONSTRUCTIONS

Sedef Shipyard has produced the anchor box segments within the piers of the Yavuz Sultan Selim Bridge (third bridge in the Bosphorus). Their total weight reaching 4000 tonnes, the steel production for the piers has been completed in the shipyard according to EN 1090-2 industrial project production procedures and delivered to the montage field with ships. The cutting, montage, and welding of the S355NI quality steel sheets (with thickness varying between 40-200 mm) has been done in accordance with tolerance.

By using this site you agree to the use of cookies for analytics and personalized content. Read more Cookies Policy